{"id":"HHS-OASH-2026-0397-4383","body_sha256":"bf30a0c18692f36567931f448b4fe561d061727646120dfa9f1d10a205cfe60d","status":"ai_reviewed","primary_topic":"smart-meters","topics":[{"id":"smart-meters","evidence":"scribes continuous residential exposure from neighboring communication-enabled smart meters and a later 5G infrastructure installation, the timing of sympto"},{"id":"infrastructure","evidence":"mmunication-enabled smart meters and a later 5G infrastructure installation, the timing of symptom onset, steps taken to reduce exposure, an"},{"id":"access","evidence":" taken to reduce exposure, and the resulting loss of work capacity and community access."}],"summary":"The commenter describes the attached account as addressing residential exposure to neighboring smart meters and later 5G infrastructure, exposure reduction, and losses of work capacity and community access.","reviewed_at":"2026-10-24T20:09:12Z","review_method":"Full comment-text review with exact source evidence; attachments not reviewed","review_source_sha256":"02eb8b60c085cf3f3b888ce6139a91741582550c08a6a0766f1ff796e62698b2","source_url":"https://rfsafe.net/hhs-comments/data/catalog.json","scope":"Original comment body; attachments excluded"}